HOW TO GET A GOOD WRANGLER 4XE Deal; Buckle up for a LONG read! (Part 3)

Yes, one pay makes the most sense. It really only bites you on short term holds in monrhly tax states.

3 Likes

The VON should be on your dealership built confirmation.

1 Like

It would show on the updated POC, after the order is actually placed by the dealer, yes.

Gotcha, would you recommend me to order one now, if I planned on keeping (but open to selling it if it opened up)?

If you want a sahara you can order now. Rubicons can no longer be ordered.

If you know you want a Sahara, put in your order so you get price protection. Thereā€™s a high likelihood that Jeep will increase MSRP for MY23.

I think this is up to you. If you need a vehicle in 2-3 months. Go ahead and order a MY22. If you can wait until September-October-November wait and order a MY23. The 2023 will have a lower monthly payment as you will get refreshed MFs and RVs.

1 Like

Definitely able to wait, wouldnā€™t be as much worried about the MSRP as much as I would be about the RV/MF. So maybe better to wait a month or two!

1 Like

Just wait till next month then and order a 2023. Keep in mind, youā€™ll prob get it in September (at the earliest) depending on how you build it

OR you could get totally shafted. I ordered my MY22 early (last year before the production started) and I just got it last weekend. We can only guess/assume/hope as to what will take place.

RV = 55% to 65%
MF = .001 to .004

Dangggg. So hard to guess!

It is nearly impossible to guess. There are specifics that seem to increase the lead times, but it isnā€™t guaranteed one way or the other. I.e. a heavily specā€™d Jeep, a HA trim, items that have to be installed at the body vendor (JB status) are some of those examples.

Totally true. Depending on what he builds, yes it could take 5-6 months.

@scottstots Stay away from the HA or SOT and or heavy options like steel bumpers, half doors etc. all known to be held up during the build process

1 Like

Iā€™d probably be building a Sahara with a hard top, maybe cold weather and safety packages. Nothing too crazy!

my SOT rubicon was built & delivered in 2 months. Only other option was Cold weather thoā€¦

Thanks :handshake: Iā€™ll probably just opt for hard top, cold weather, potentially safety packages

Ordered 4/26
Scheduled 5/5

When does it get built?

that is the million dollar question everyone is wondering.